Projects

Completed Projects

Project Description Work Strength
Water Supply Scheme
Water Supply Scheme under Drinking Water and Sanitation Division, Garhwa on turnkey basis for the Year 2018-19.
185.17 Cr
Construction of two lane
Construction of two lane with hard shoulder of Kohima-Jessami Road on NH29, (Old NH-150) from existing Km 53.220 (near Kikurma Village) to existing Km.76.320 (near Mesulumi Village) [Design Km.51.5 to design Km.74.2] [Design Length – 22.7 Km]in the state of Nagaland Under Bharatimala Pariyojana on w EPC Mode (Package-III)
206.26 Cr
Completion of Remaining works of Lagon
Construction / Completion of Remaining works of Lagon (Package-1), Kachnoda Kalan (Package-2), Jakhlaun-Birdha, Dhorra-Balabehat & Kadesra Kalan – Mau (Package-3) Group of Villages Pipe Water Supply Scheme followed by O&M for 10 years of Complete Work of Pipe Water Supply Scheme w in Lalitpur District (Based on Surface Water)”
394.25 Cr
Nagarjuna Sagar Canal, AP
Improvement of Road Barmer-Chohtan-Kelnor From Km.8.150 to Km. 72.500 (Barmer to Bijdiar Net Length 64.00 Km) From Existing IW/CL-9 Specifications to NHDL Specification in 45 BRTF Area Under Project Chetak in Rajasthan State.Authorised subcontractor 49% of Principal contractor)
26.00 Cr
Nagarjuna Sagar Canal, AP
Improvement of Road Barmer-Chohtan-Kelnor From Km.8.150 to Km. 72.500 (Barmer to Bijdiar Net Length 64.00 Km) From Existing IW/CL-9 Specifications to NHDL Specification in 45 BRTF Area Under Project Chetak in Rajasthan State.Authorised subcontractor 49% of Principal contractor)
57.00 Cr
Galudih Left Main Canal
Construction of Earth Work, PCC Lining, WBM Road and Structures from Km 14.00 to Km 24.00 of Galudih Left Main Canal.
40.00 Cr
Nagarjuna Sagar Lal Bahadur Canal - Nalgonda District
Modernization of LI Scheme on NSLBC in Nalgonda District – Renovation of 8 LIFT Irrigation scheme from Km 49.790 to Km 66.400 on Nagarjuna Sagar Lal Bahadur Canal.
19.80 Cr
Chandil Left Main Canal
Construction of Earth Work, Lining, WBM Road and Structures of Nutandih & Kalapathar Sub-Distributory (OR-61, 62 & 63) Ex. Km 125.13 of Chandil Left Main Canal.
36.16 Cr
Nagarjuna Sagar Jawahar Canal, AP
Rehabilitation and modernization of minor canal system under WUA in DC.1 Macherla, DC.6 Tangeda,DC.7 Bellamkonda, DC.9 Chamarru, DC.14 Pedakurapadu, DC.15 Amaravathi, DC.17 Guntur,DC.18 Ponnekallu of Nagarjuna Sagar Jawahar Canal,AP
143.74 Cr
Kurnool Ultra Mega Solar Park, AP
Construction of Ground Level Water Tank for Kurnool Ultra Mega Solar Park at sakunala & Gani, Kurnool Dist. A.P.
19.22 Cr
Special Repairs to Canal and Structures
Package No.2: Special repairs to canal and structures pertaining to RBHLC to restore its design discharges from Km.44/000 to Km.50/000
32.02 Cr
CC Lining and Damaged Structures
Package No.10: Special repairs to Canal, CC lining and damaged structures pertaining to Power Canal to restore its design discharges from Km.7/000 to Km.20/450
60.58 Cr
Improvements to Pushkara Ghats
Improvements to Pushkara Ghats at Vykuntapuram, Sitanagaram, Batrupalem village, Tangeda village, Govindapuram village and Srisailam.
53.47 Cr
CWSS
Providing CWSS to Azhagiyapandipuram and 8 other town pachayaths and 246 rural habitations in Kanyakumari District with river Kodayar as source including maintenance for a period of 12 Months
84.34 Cr
ProvidingWater Supply House
Providing Water Supply House Service Connections and Distribution lines wherever, Reservoirs and sources is available in Kakinada Municipal Corporation
38.51 Cr
Construction of net balance works
Construction of net balance works L.I. Scheme –II on foreshore of Srisailam Reservoir in Nandikotkur (M) of Kurnool .
15.62 Cr
Construction of EarthWork
Construction of Earth Work, Lining and Structures of Kapali Minor & Gouri Minor Ex-Km 0.02 of Kapali Minor
19.82 Cr
Construction
Construction of Cross Regulator cum Drop @Km 17.650 of Link Channel of HNSS Main canal
11.12 Cr
Osmansagar Reservoir
Mission Kakatiya- Protection of Osmansagar Reservoir (providing amenities around the lake along full tank level) andImprovements to feeder channels of large tank, Ibrahimpatnam Village
19.48 Cr
C&C on Turnkey Basis
C & C on Turnkey basis of Patcherlabodu Thanda LI Scheme on Musi River near Jampally (V) in Bibi Nagar (M), Nalgonda District.
14.91 Cr
ConstructionWorks, Karnataka
Formation and Construction of Roads, Retain Wall & Storm Water Drains in Badami Bagalkot District, Karanataka.
13.61 Cr
Restoration of Roads
Laying Jointing testing &commissioning of additional Sewer lines along with restoration of roads , construction of manholes in Alwar.
36.80 Cr
Improvements of Roads and drains
Improvements of Roads and drains at Raichur City , Karnataka.
36.68 Cr
Laying Jointing Testing
Laying Jointing testing and commissioning of additional Sewer lines along with restoration of roads, construction of manholes and appurtenances in Naguar Town.
34.65 Cr
Construction of StromWater Drains
Construction of Strom Water Drains – Peekalavaagu
18.00 Cr
StormWater Drainage and Disposal
Kakinada Municipal Corporation-Providing Storm Water Drainage and disposal under AMRUT Phase-II for the year 2016-2020
78.47 Cr
Upgrading/ Improvement
Execution of the upgrading/ Improvement of devadaha-Lianu- parsa Section of Lumbini Buddist Circuit Road (Ch.3+000 to Ch.45+600) – NEPAL
59.80 Cr
Road ImprovementWorks
Road improvement works in Hospet city limits, Ballery District
13.10 Cr
APCRDA
APCRDA, Vijayawada –Nelapadu (Phase-II) in Amaravathi Capital City Area
53.49 Cr
APCRDA
APCRDA, Vijayawada – Jungle Clearance at various locations
16.25 Cr
APCRDA
Layout development works under Navaratnalu schme in Prakasam Dist, A.P.
42.00 Cr
Nadikudi - Srikalahasti New BG line Project
Nadikudi - Srikalahasti New BG line Project- Providing selected Contractor's own earth of SQ2/SQ3 Quality prepared sub-grade and Blanketing material to GE:0014 Specifications from Ch:4500 m to Ch: 35500m in between Piduguralla (New) and Rompicherla (Pro) stations.
22.31 Cr
Nadikudi - Srikalahasti New BG line Project
Nadikudi - Srikalahasti New BG Line Project - Proposed construction of RUB No 22 as 4x 12.0x 5.5m RCC Box (Cast in Situ) with open foundations across NAM Express Highway at CH:14282.0m
20.31 Cr
OHE & TrackWorks
Execution of OHE & Track works at Kallur, Karnataka (Private Siding for CCCL, taking off from CCI Siding – Inside compound wall and earth works
42.00 Cr
Construction of School
Construction of Kittur RaniChennamma Residential School (SC) at Kawanchur, Siddapurataluk, Uttarkannada Dist.
11.65 Cr
Excavation of Sand
Excavation of sand 24000000CBM from Block 3 of Elkeshwaram, Submergence area of Medigadda Barrage Kaleswaram Project and transport same quantity of sand to nearby Stockyard.
163.44 Cr
Construction of Two Lane Bridge, Kakinada
Construction of two lane road bridge effective span of 32 mm at Prathap Nagar, Kakinada
25.63 Cr
Construction of Double Lane Bridge, Prakasam Dist
Construction of double lane bridge at KM 33.280 of Romper right arm in Prakasam district
21.56 Cr
Dachepalli Project
Dachepalli Project: Letter of intent for Provision of OHE Arrangements in Connection with Electrification of private siding for M/s. Chettinad Cement Corporation Pvt Ltd., taking off from Thummalacheruvu railway station in Guntur – Nadikudi section of Guntur Division, SC RLY
12.70 Cr
Chettinad Builders
Chettinad Builders – Work order to execute Earth work, Drains, Bridges, P WAY & Other Mics works for our Railway siding at Dachepalli Unit.
60.00 Cr

Ongoing Projects

Project Description Work Strength
Kakatiya Main Canal
Modernisation of Kakatiya Main Canal in SRSP at Hanumakonda and LMD Colony, Karimnagar.
42.08 Cr
Rameshwaram Municipality
Providing underground Sewarage Scheme to Rameshwaram Municipality in Rameshwaram District including maintenance of the scheme for a period of 5 years.
36.66 Cr
Paleru River
C & C of Thakkellapadu LI Scheme on Paleru River in Jaggaiahpet Mandal of Krishna District on Turnkey basis including operation of the scheme for two years.
15.16 Cr
Water Supply House Service Connections
Providing Water Supply House Service Connections in Guntur Municipal Corporation under AMRUT Scheme
18.73 Cr
Water Drainage and disposal
Machilipatnam Municipality - Providing Storm Water Drainage and disposal under AMRUT Phase-II for the year 2016-2020 in Machilipatnam Municipality
18.27 Cr
Nellore Municipal Corporation
Nellore Municipal Corporation - Providing Storm Water Drainage - AMRUT - SAAP - 2016-20
70.17 Cr
Machilipatnam Municipality
Machilipatnam Municipality - Storm Water Drainage Scheme of balance works phase-I under any grant funding by the Government
58.28 Cr
Rajamahendravaram Municipal Corporation
Rajamahendravaram Municipal Corporation - Providing Storm Water Drainage and Disposal project under AMRUT Phase-II for the year 2016-20
69.35 Cr
Rural Road Connectivity
Providing Rural Road Connectivity to Unconnected Habitations of 250+Population, Panchayat Raj Engineering Department, Andhra Pradesh, APRRP (AIIB)
71.34 Cr
high-altitude hill road
Construction of high-altitude hill road from Tedadege to Henkaer from km 0.000 to km 28.550 in West Siang District of the state of Arunachal Pradesh on EPC mode
261.00 Cr
NDB RoadWorks
NDB Road Works – East Godavri Dist, Andhra Pradesh
166.00 Cr
AIIBWater Supply
AIIB Water Supply – West & East Godavari Dists., Andhra Pradesh
458.00 Cr
Potka RuralWater Supply
Potka Rural Water Supply Scheme under DWS Division Adityapur for the year 2022-23 on Turnkey basis
257.75 Cr
RWSS – Intakewell at Markapuram
RWSS – Intakewell at Markapuram, Veligonda Reservoir, Prakasam Dist, Andhra Pradesh
68.00 Cr
Water Supply Project
Water Supply Project for Manipur State (Providing Drinking Water Supply to Rural Area of Manipur (231 schemes), Works.Package: RWS P-VIII (W) on turnkey basis complete
376.50 Cr
Various rural water supply projects
Construction of various rural water supply projects including O&M for 5 years in the state of Jharkhand in D.W. & S Division, Sahibganj
252.83 Cr
DrinkingWater Facility and Tank Filling for Mining Affected Villages
Survey, Investigation, Design, Supply, Installation, Testing & Commissioning of Comprehensive scheme for providing drinking water facility and tank filling for mining affected villages in and around Papinayakanahalli & Other Villages in Hospet Taluk, Bellary District
216.39 Cr
Remediation and Reclamation
Remediation and Reclamation of Existing Dumpsite through Bio Mining in Cluster - 4 - for 12 ULBs in Khammam, Bhadradri Kothagudem & Mahabubabad Districts, Telangana
45.74 Cr
Remediation and Reclamation
Remediation and Reclamation of Existing Dumpsite through Bio Mining in Cluster - 7 - for 10 ULBs in Kamareddy, Nizamabad & Nirmal Districts, Telangana
52.01 Cr
Remediation and Reclamation
Remediation and Reclamation of Existing Dumpsite through Bio Mining in Cluster - 3 - for 6 ULBs in RangaReddy District, Telangana
14.09 Cr
Construction of Distributary
Construction of Distributary No.26,27,28 and 29 their Lateral network & NRBC Distributary-23 from km 28.337 to 36.920 Km including of lateral under NRBC extension (KBJNL/2022-23/IW/WORK_INDENT23168)
113.28 Cr
Remediation and Reclamation
Detailed Survey, designing and drawing, Construction of RCC Intake well cum Pump House, 110 mtr. Long & 3.60 mtr. Wide Gangway, 12.50 MLD capacity Conventional Water Treatment Plant, RCC Elevated service reservoir – 07 Nos staff quarter, compound wall, supplying and laying raw, clear water rising main and distribution network, House connections – 24854 Nos., Burujbani (Burjudih) and adjoining Villages Rural Water Supply Scheme under D.W.&S. Division, Jamshedpur on turnkey basis.
157.15 Cr
Water Supply Projects
Request for proposals for empanelment of contractors for implementation of various rural water supply projects including O and M for 10 years in division Azamgarh Uttar Pradesh.
1402.02 Cr